Currently Browsing : Uncategorized

Using the L2 in non-winter climates Pt. 1: Southwest 0

Posted on 3, May 2017

in Category Uncategorized

During the winter, everyone (including us at Line Ward) seems to talk about “slow periods” and “down time.” Located in Buffalo, N.Y., we have almost a one-track mind: if we have snow, everyone does, too. But so many of our customers live in areas where snow is a rare occurrence. And for those people, we’ve created a series just for you, starting with the southwestern United States. The southwest (Nevada, southern California, Arizona, etc.) is widely recognized as a hot and dry desert area, making the soil hard and tough. This might not sound like the best ground conditions for … Continue reading

Read More

Specialized vibratory plow blades by Line Ward 0

Posted on 31, March 2017

in Category Uncategorized

For our customers’ convenience, Line Wad provides a wide variety of vibratory plow blade options for the L2 Line Layer. We understand that every job is different, and having the appropriate tools on-hand makes your installations move quickly, with no problems (hopefully). Our plow blade options will let you complete any job with ease, no matter the location or terrain. Each standard reciprocating blade can reach a 13-inch depth with one-inch increments. Line Ward also provides 16-inch blades upon request. Six varieties of blades are available so you can have the perfect blade no matter the installation. The blade options … Continue reading

Read More

3 Signs That Tell You Your Project Requires The L2 Line Layer 0

Posted on 13, October 2016

in Category Uncategorized

Every line installation comes with its own set of challenges, some more complicated than others. But you don’t need to let a few bumps in the road affect your installation. Many of these “problems” that result in hand labor, a torn-apart yard, and extra time spent can all be taken care of with one tiny, powerful machine: The L2 Line Layer. If you run into any of these problems, you know it’s time to invest in one. The path you’re (working) is too narrow  Sometimes, machines are just too big to get through narrow pathway, and resorting to hand labor … Continue reading

Read More

L2 Line Layer: Why this Compact Size Vibratory Plow is a Better Choice than other Vibratory Plows Available in the Market? 0

Posted on 17, August 2016

in Category Uncategorized

Vibratory plows are supposed to be convenient, right? And being able to install pipes, wires and conduit without digging trenches and ruining the land is pretty convenient. But what about getting into those small spaces or tight turns? A lot of those parts need to be done by hand, and that can take time and money—not to mention that there’s a lot of room for error. But with Line-Ward’s L2 Line Layer, these problems are a thing of the past. The patented design of the L2 Line Layer is the most compact in the market. The machine is a mere … Continue reading

Read More

Everything You Need to Know When Buying an Irrigation Pipe Puller 0

Posted on 3, August 2016

in Category Uncategorized

When installing an irrigation system in your yard, there are a lot of things to think about. Trenching or pipe pulling? What do I need to look for in my equipment? And what’s going to create the least damage to my lawn? We’ll make this simple for you: pipe pulling is better than trenching. It will cause minimal damage to your lawn as opposed to trenching, which digs up everything in its path. With the L-2 Line Layer, pipe pulling is easy, and creates nothing but a slit in the ground. As for what you should be looking for in … Continue reading

Read More

Understanding the Process of Horizontal Drilling 0

Posted on 26, July 2016

in Category Uncategorized

Horizontal drilling is a four step process that is less invasive than trenching, yet more secure. The process allows you to work while avoiding surface obstacles like rivers and highways. For a deeper look inside horizontal directional drilling, take a look at the four steps in detail. Geo survey and design.  Before any drilling takes place, there must be a detailed survey and mapping of the land under construction. Only then can a design be made for the project. Pilot hole drilling. The launch and reception pits are excavated at both ends of the drilling line. Then, following the design … Continue reading

Read More

Best Practices for Using The Cable Burying Machine for Best Results With Less Effort 0

Posted on 26, July 2016

in Category Uncategorized

From safety to efficiency, there are many aspects to think about before using a cable burying machine. That being said, here is a list of best practices in order to use the cable burying machine for best results. -Before beginning the project, all workers must be fully educated and comfortable with the machinery. Proper training and supervision are required to keep workers safe. All workers must understand and be familiar with the Occupational Safety and Hazard Act, along with local, state federal and industry codes and regulations. -The machinery and cables should be properly inspected to avoid mishaps or injury, … Continue reading

Read More

L2 Line Layer from Line Ward Featured In October 2015 Edition of the Utility Source 0

Posted on 9, December 2015

in Category Uncategorized

The installation of underground cable, piping, and conduit has always been a task which requires specialized equipment in order to accomplish the job efficiently. Equipment that is maneuverable, efficient, versatile, and customizable can help to accomplish the task for more production and profit. The answer to the above problem is the L2 Line Layer from Line Ward Corporation. It uses trenchless technology to reduce lawn restoration and can provide efficient underground installation for a variety of job types in an effective and precise manner. It is compact, but powerful and has an optional boring attachment that makes it highly effective … Continue reading

Read More

Trenchless Line Layer for Easy Underground Installation of Lines, Cables, Pipes 0

Posted on 28, August 2015

in Category Uncategorized

Underground installation of cables, lines, and pipes can be a difficult job if you do not have the right equipment. A vibratory plow or line layer is best used for this purpose. But, before you spend your money on any of these, you should do your research. Does the line layer you are looking at provide precise cutting of the ground with minimal lawn damage? If not, then you might be in for some extra work, trying to restore the area. You need to buy equipment that uses the rapidly growing trenchless technology so that underground installation doesn’t affect do … Continue reading

Read More

L2 Line Layer from Line-Ward 0

Posted on 17, December 2014

in Category Uncategorized

The advancement in technology and the invention of high-tech machines and tools has simplified many tasks. Trenchless technology implementation is one of the many innovations in the construction world that has increased efficiency when installing underground utilities. The increasing emphasis on infrastructural development projects for urban and rural areas made it essential to invent improved processes for installing underground utilities. This process requires less disruption and essentially no restoration work and is one of the most efficient techniques to lay underground utilities and lawn irrigation. If trenchless technology is in your plans, then you will first have to find the … Continue reading

Read More
5/ 5stars
0